Six factors, each with its reasons
The score reads the tender analysis, your company profile, your Evidence Vault, your approved library content and your record of bids won and lost. Each factor shows its score, the rationale and the signals behind it, so you can see which factor is holding the score down.
A strong Bid Score is not a promise of a win, and a weak one is not a ban.
Client & relationship
Payment record, where the money comes from, repeat work.
Project fit
Scope, contract size and site against the work you do.
Capability & resources
Key personnel, certifications, plant and past projects.
Competition
Likely bidders, any incumbent and the evaluation method.
Profitability
Margin, payment terms, currency and the cost of bonds.
Risk & conditions
Contract risk, programme, site access and obligations.
The win rate the bid needs to pay for itself
Every tender you price costs time and money whether you win it or not. Beside the score, Bidligence estimates what a compliant bid of this size costs to prepare and shows the break-even win rate: cost of bidding ÷ expected profit if won. Overwrite the cost with your own figure and the break-even follows.
Try the same sum with your own figures. Nothing you type leaves this page.
Break-even win rate
Any currency, as long as all three are the same. Nothing you type leaves this page.
You need to win at least 9.4% of bids like this one — about 1 in 10 — for them to pay for their own preparation. If your record on this kind of work is lower, this tender needs a better reason than its size.
Close the gaps, then re-score
A conditional score is a list of things to fix, not a soft yes. Upload the missing evidence to the Company Vault, or record a commitment, such as forming a joint venture or recruiting key personnel before mobilisation, and score again.
Commitments reach the bid documents as forward commitments, such as "will recruit", never as staff, plant or experience you already have. If nothing has changed, the stored score stands and no credits are spent.

A record of every tender you pass on
No bid — pass deletes nothing. The bid keeps its analysis and its Bid Score, appears under the Passed tab of your bids list and counts beside your win rate on the dashboard. On Pro, pipeline analytics compare Bid Score bands with the bids you won and lost, so you can test whether your screening predicts your wins.
Coastal road resealing, 42 km
Passed · Bid Score 41
No-bidDistrict clinic extension
Passed · Bid Score 52
ConditionalReservoir outlet rehabilitation
Passed · Bid Score 38
No-bid
Where it fits in your bid
The Bid Score is the Decide step of the bid wizard, after Upload and Analyse. Bid — proceed opens Configure, and from there the priced BOQ and the Submission Guard take over. Hunter, the bid agent, can run the score from a chat and explain it. It advises; your team decides.
Upload
The tender pack
Analyse
What the tender asks for
Decide
Bid Score and break-even
Configure
Margin, team and documents
Questions
Something else? Ask the team.
Does Bidligence make the bid/no-bid decision for us?
No. The Bid Score recommends and explains; a member of your team records the decision with Bid — proceed or No bid — pass, with a note if they wish. Hunter, the bid agent, can also record the call from a chat, and is instructed to do so only once you have clearly decided.
What happens to the tenders we pass on?
They stay, with their analysis and Bid Score, under the Passed tab of your bids list, and each files a lesson with your note.
Can I try the Bid Score on the free plan?
Yes. The 500 welcome credits a new account's free workspace receives once your e-mail is confirmed cover analysing a tender, its Bid Score and a priced BOQ. Generating the bid documents needs Starter, Pro or Advanced.