Each tender read against its own rules
A road tender from a US state DOT, a framework from a UK council and a World Bank-funded works contract in Kenya are judged by different rules, built to different standards and priced against different markets. A profile shapes how the tender is read, written and priced.
- regional procurement profiles, plus a global default
- 21
- currencies to bid and report in
- 151
- exchange-rate refresh
- Daily
Examples from the profiles
A sample of what the profiles hold today, abridged. For the development banks' own documents, read World Bank bidding documents explained.
| Profile | Procurement rules | Standards |
|---|---|---|
| Global (default) | MDB standard procurement documents | FIDIC 2017, ISO 9001, 14001 and 45001 |
| United States | FAR and DFARS; state procurement codes | ACI, AASHTO, ASTM, OSHA |
| United Kingdom | Procurement Act 2023; social value weighting | Eurocodes, CDM 2015, NEC4 / JCT |
| India | GFR 2017; two-bid system | IS (BIS), IRC, MoRTH |
| South Africa | PPPFA; CIDB grading; B-BBEE scoring | SANS, COLTO, JBCC |
| Brazil | Lei 14.133/2021; SINAPI and SICRO ceilings | ABNT NBR, DNIT |
151 currencies, with exchange rates refreshed daily
Bid in one currency, take supplier quotes in another and report in your own. The BOQ shows the bid price in the bid currency with an approximate figure in the bid's reporting currency, and the dashboard totals your pipeline and won value in your workspace's reporting currency.
Where an amount cannot be converted, Bidligence holds it back rather than counting it one-for-one.
| Key fact | Value |
|---|---|
| Estimated value | KES 412,000,000 |
| Bid price | KES 398,500,000 |
| In reporting currency | GBP 2,430,850 |
| Profit margin | 10% |
Changing a bid's currency: convert or relabel
Once a BOQ has priced rates, a currency change is a decision, not a field edit. Convert multiplies every rate, and the tender's estimated value, by one exchange rate and flags every document already generated for update. Relabel keeps the numbers exactly as typed, which is right when a tender was simply labelled wrongly. Re-analysing a tender never re-prices a BOQ behind your back.
Move this bid from USD to EUR?
- Done: Convert at 1 USD = 0.9200 EURRates and estimated value
- Note: Relabel only — keep the numbersFor a mislabelled tender
Where it fits in your bid
The profile and the currencies follow a bid from the first screen to the last. A notice from the tender feed sets the bid's profile from its region, the Bid Score shows the cost to bid in the bid's reporting currency, BOQ pricing builds rates in the bid currency, calibrated to the profile's market, and deadline tracking holds the closing date in the tender's time zone.
Start a bid
Profile and bid currency
Analyse
Records the closest profile
Score and write
With the profile's rules
Price
Calibrated to its market
Report
In your currency
Questions
Something else? Ask the team.
Which procurement profiles are there?
A global default based on World Bank and FIDIC practice, plus 21 regional profiles, including the United States, Canada, the United Kingdom, the European Union, India, Singapore, the UAE, Saudi Arabia, South Africa, Kenya, Nigeria, Ghana, Egypt, Brazil, Mexico and the Philippines.
My country has no profile of its own. Can I still use Bidligence?
Yes. Nothing requires a regional profile. Start the bid on the global profile, the default, and the analysis records the closest profile along with the procurement framework, contract type and evaluation method the tender itself states.
Where do the exchange rates come from, and how fresh are they?
From a public exchange-rate feed, refreshed once a day. A rate more than a day old is refreshed in the background when it is next used.
Does choosing a profile make my bid compliant with that country's rules?
No. A profile shapes how the tender is read, written and priced; it is not a compliance check. The tender's own instructions to bidders prevail, and the Submission Guard checks your package against the requirements read from the tender itself.
