What gets a tender rejected
Development-bank bidding documents spell it out. Under the World Bank's Request for Bids for small works (September 2025 edition), a bid received after the deadline is rejected and returned unopened, and where a bid security is required, a bid without a substantially responsive one is rejected.
Other bidding documents word these rules differently. For the common failures in more detail, see why tenders are rejected.
A late bid
Rejected and returned unopened.
The wrong bid security
Missing, in the wrong amount or too short.
Validity too short
Not valid as long as the bid data sheet asks.
A material deviation
A reservation or omission.
A missing form
A mandatory form or schedule left out.
An expired certificate
Out of date when you submit.
A tender compliance check built from the tender itself
When you upload the tender pack, the analysis lists the requirements that would cause rejection if missed, in the tender's own words. The Submission Guard turns them into a checklist, one row per item.
Where the tender is silent on items commonly required in its procurement framework, such as a power of attorney, it may add them as optional rows with a note to confirm in the instructions to bidders. Rows you add yourself are kept every time the checklist is rebuilt.
- Forms
- Certificates
- Financials
- Bonds
- Technical
- Format rules
- Submission
- Legal
Matched against your Evidence Vault
Each row is matched against your Evidence Vault. Where a certificate, licence, policy or financial statement satisfies it, the row links to that item and shows its expiry date. You can change any link or upload the missing file from the row itself: it goes into your Company Vault, links to the row and marks it Ready.
A form drafted for signature stays In progress with a note to sign, stamp or attach the required original, and a certificate, financial statement or bond is never satisfied by a generated document.
| Requirement | Status | Evidence |
|---|---|---|
| Tax clearance certificate | Ready | expires 30 Jun |
| Contractor's licence | Missing | expired 2 Sep |
| Method statement | Generated | Generated document |
| Letter of bid | In progress | Sign and stamp |
| Power of attorney | Missing | Link evidence |
The pre-submission audit
Every document generation run ends by rebuilding the checklist. Above it, an audit lists what still stands between the package and the deadline: mandatory items still missing, the bid security the tender requires, linked evidence that has expired, unverified claims in the generated documents, a missing priced BOQ and a deadline that is close.
Beside it, a countdown shows the closing date and time in the tender's time zone, with the submission method and address. Even when the audit is clean, it asks for a final human read-through of every form.
Pre-submission audit
- Missing: 2 mandatory items still missing
- Warning: Bid security: check amount, wording and validity
- Missing: 1 linked evidence item has expired
- Warning: 3 unverified claims to confirm or remove
- Warning: Closing in 2 days: allow for upload time
Addenda that change the requirements
When you upload an addendum and review it, Bidligence shows what changed, adds its new requirements to the checklist as Missing with a note naming the addendum, moves the deadline if the closing date changed, and flags the generated documents that need updating. The most recent review can be undone.
Upload the addendum
See what changed
New rows added
Marked Missing
Deadline moved
If the closing date changed
Documents flagged
To update
What still needs a person
The Submission Guard is a checklist and an audit, not a guarantee of compliance. The evaluation belongs to the procuring entity, and some steps only your team can take.
For how bid security and bid validity periods fit together, read bid security and bid validity.
Stays with your team
- Sign and stamp the forms
- Obtain the bid security from a bank or surety
- Read the final package against the instructions
- Deliver it in time
The Submission Guard
- Lists the mandatory items the tender names
- Links your evidence and its expiry date
- Audits the package before the deadline
- Adds an addendum's new requirements
Questions
Something else? Ask the team.
What does the Submission Guard check?
Every mandatory form, certificate, bond, format and submission rule read from the tender, matched against your Evidence Vault and the documents Bidligence generated.
Does a clean Submission Guard mean my bid is compliant?
No. It is a check, not a guarantee: the evaluation is the procuring entity's, and signatures, originals, the bid security and delivery remain your team's job.
Does it catch expired certificates?
Yes, for evidence linked from your Evidence Vault with its expiry date recorded: each linked item shows that date and the audit counts linked items that have expired. The vault and the dashboard also flag items close to expiry.
Can Bidligence fill in the tender's own bidding forms?
Yes, when they are issued as a Word (.docx) document. Bidligence writes into the blanks and keeps the employer's wording, numbering and layout; signature lines are left for you, and anything it cannot ground in your evidence is marked to confirm.
Sources
Rules and portals change. Check the tender’s own documents and the official source before you rely on any of this.