Check your tender is compliant before you submit

A tender can be rejected for something small: a missing form, an expired certificate, a bid security in the wrong amount or for too short a period, or a bid that arrives late. Bidligence's Submission Guard turns the tender's mandatory documents, forms, certificates, bonds and format rules into a checklist matched against your Evidence Vault, and audits the package before you seal it.

It checks; it does not guarantee. Signatures, originals and the bank's guarantee are still yours to arrange, and the checklist keeps drafted forms marked as still to be signed.

Create your workspace Reviewed 09/10/26

What gets a tender rejected

Development-bank bidding documents spell it out. The World Bank's Request for Bids for small works (two-envelope, September 2025 edition), for example, says that:

Other bidding documents word these rules differently, so read the instructions to bidders and the bid data sheet of the tender in front of you. For the common failures in more detail, see why tenders are rejected.

  • a bid received after the deadline is declared late, rejected and returned unopened;
  • where a bid security or bid-securing declaration is required, a bid without a substantially responsive one is rejected as non-responsive;
  • a bid that is not valid until the date set in the bid data sheet, or any extended date, is rejected as non-responsive;
  • a technical part that is not substantially responsive, because of a material deviation, reservation or omission, is rejected and cannot be made responsive afterwards by correcting it;
  • a bid is rejected if its bidder does not accept the correction of arithmetical errors in its price.

What Bidligence reads from the tender

When you upload the tender pack, the analysis lists the requirements that would cause rejection if missed, in the tender's own words, and files each as a form, certificate, financial, bond, technical, format, submission, legal or other item. It also records:

The rest of what the analysis extracts is on the AI tender analysis page.

  • the bid security: whether one is required, its type, amount, currency, validity, acceptable issuers and wording, where the tender states them;
  • the bid validity period as amended, with a direct read of the tender text when the analysis finds none;
  • the closing date and time in the place of submission's time zone, read from every document and amendment, with the most recent change taking precedence;
  • the returnable schedules in the tender's own numbering, and any prescribed format such as fonts, page limits, copies, binding and envelope marking;
  • the submission method and address.

A checklist matched against your evidence

The Submission Guard turns those requirements into a checklist, one row per item. Where the tender is silent on items commonly required in its procurement framework, such as a power of attorney or page initialling, it may add them as optional rows with a note to confirm in the instructions to bidders.

Each row is matched against your Evidence Vault. Where a certificate, licence, policy or financial statement satisfies it, the row links to that item and shows its expiry date. You can change any link or upload the missing file from the row itself: it goes into your Company Vault, links to the row and marks it Ready. The readiness score counts the mandatory items that are ready.

Documents the bid package produces are linked by fixed rules, not by the model. A generated method statement or programme marks its row Ready. A form drafted for signature stays In progress with a note to sign, stamp or attach the required original, and a certificate, financial statement or bond is never satisfied by a generated document. Rows you add yourself are kept every time the checklist is rebuilt.

The pre-submission audit

Every document generation run ends by rebuilding the checklist. Above it, an audit lists what still stands between the package and the deadline:

Beside it, a countdown shows the closing date and time in the tender's time zone, with the submission method and address. Even when the audit is clean, it asks for a final human read-through of every form.

Two generated documents check content as well as paperwork: the Compliance Matrix marks each mandatory requirement and key evaluation criterion compliant, partial or missing with the action required, and the Mock Evaluator lists pass/fail issues separately from its score.

  • the number of mandatory items still missing;
  • the bid security the tender requires, with its type, amount and validity, and a reminder to check amount, wording and validity against the instructions to bidders;
  • linked evidence that has expired;
  • unverified claims flagged in the generated documents, to confirm or remove;
  • a missing priced BOQ;
  • a deadline that is close, with a reminder to allow for courier or portal upload time.

Addenda that change the requirements

When you upload an addendum and review it, Bidligence shows what changed, adds its new requirements to the checklist as Missing with a note naming the addendum, moves the deadline if the closing date changed, and flags the generated documents that need updating. If the new closing date cannot be read or has already passed, the deadline is left alone and you are asked to set it by hand. The most recent review can be undone.

The tender's own forms, completed in its own file

When the tender issues its bidding forms as a Word (.docx) document, Bidligence completes that file. It writes into the blanks, such as "[insert …]" instructions, "____" lines and empty table cells, and where a form asks for a description, such as a method statement, it adds the bid's own content beneath the instruction. The wording, numbering, fonts and layout stay as issued. A form the tender says to complete once per person or item of equipment is repeated for each.

Signature, seal and witness lines are left for signing by hand. Facts Bidligence cannot ground in your Evidence Vault are written as "[CONFIRM: …]" and listed for you to check, and every form quotes the price the tender's own BOQ workbook totals to. Forms issued only as PDF cannot be edited in place, so Bidligence follows their wording and numbering in its own documents.

Keep the evidence current between tenders

The Company Vault holds your certificates, licences, insurances, policies, CVs and financial statements with their expiry dates, and flags items that have expired or are close to expiry; the dashboard lists them too. Deadline reminder e-mails go out on the days each team member chooses and say how many mandatory checklist items are still missing. The complete package ZIP carries the Submission Checklist and the vault files linked on it.

What still needs a person

The Submission Guard is a checklist and an audit, not a guarantee of compliance. The evaluation belongs to the procuring entity, and some steps only your team can take:

  • sign and stamp the forms, and initial pages where the tender asks for it;
  • obtain the bid security from a bank or surety in the tender's form, amount, currency and validity, and arrange any notarised or original documents;
  • read the final package against the instructions to bidders and the bid data sheet, including any late addendum;
  • deliver it, by portal upload or by hand, in time.

For how bid security and bid validity periods fit together, read bid security and bid validity. The rates behind your price are covered on the BOQ pricing page.

Questions

What does the Submission Guard check?
Every mandatory form, certificate, bond, format and submission rule read from the tender, matched against your Evidence Vault and the documents Bidligence generated. Its audit lists missing mandatory items, expired linked evidence, the bid security required, unverified claims and a deadline that is close.
Does a clean Submission Guard mean my bid is compliant?
No. It is a check, not a guarantee: the evaluation is the procuring entity's, and signatures, originals, the bid security and delivery remain your team's job.
Does it catch expired certificates?
Yes, for evidence linked from your Evidence Vault with its expiry date recorded: each linked item shows that date and the audit counts linked items that have expired. The vault and the dashboard also flag items close to expiry.
What happens when an addendum is issued?
Upload it and run the addendum review. Bidligence adds the addendum's new requirements to the checklist, moves the deadline if the closing date changed, and flags the documents that need updating.
Can Bidligence fill in the tender's own bidding forms?
Yes, when they are issued as a Word (.docx) document. Bidligence writes into the blanks and keeps the employer's wording, numbering and layout; signature lines are left for you, and anything it cannot ground in your evidence is marked to confirm.

Sources

Rules and portals change. Check the tender’s own documents and the official source before you rely on any of this.

Check your next tender before you submit it

Create a workspace and upload your next tender pack: Bidligence lists the mandatory items it asks for and checks your package against them before the deadline.

Cookies on Bidligence

We use strictly necessary cookies to keep you signed in, protect your account and take payments. With your permission we also remember interface preferences on this device — theme, language and the 3D view’s look. We use no advertising or analytics cookies. Cookie Policy