The platform

Catch what gets bids rejected before you seal the envelope

A missing form, an expired certificate, a bid security in the wrong amount or a bid that arrives late can put you out of a tender before anyone reads your method statement. The Submission Guard turns every mandatory form, certificate, bond, format and submission rule in the tender into a checklist, matches each row to your Company Vault and to the documents Bidligence drafted for this bid, and audits the package before you submit it.

It is a check, not a promise of compliance. It shows your team what is missing, expired or still to be signed, so the last days before the deadline go on closing gaps rather than finding them. The evaluation belongs to the procuring entity, and signatures, originals and the bank's guarantee stay with you.

Create your workspace Reviewed 12/10/26

What the Submission Guard checks

Rules differ by funder and by country. Under the World Bank's Request for Bids for small works (September 2025 edition), for example, a bid received after the deadline is rejected and returned unopened, and where a bid security is required, a bid without a substantially responsive one is rejected. A tender from a national portal in Kenya, India or the UK words its own rules, which is why the checklist comes from the tender in front of you, not from a fixed template.

When you upload and analyse a tender pack, the analysis lists the requirements that would cause rejection if missed, in the tender's own words, and files each as a form, certificate, financial, bond, technical, format, submission, legal or other item. It also reads the bid security terms, the bid validity, the closing date and time in the tender's time zone, and the submission method and address. Bidligence's Super Intelligence is instructed to build the checklist from that:

  • One row per mandatory item the tender names, keeping the tender's own reference where it has one, and G-01, G-02 and so on where it does not.
  • Standard items the tender left unsaid. Where the tender is silent on items commonly required in its procurement framework, such as a signed bid form, power of attorney, company registration, tax clearance, audited accounts, separate technical and financial envelopes, page initialling or copies on USB, it may add them as optional rows with a note to confirm in the instructions to bidders.
  • Notes on each row for format, signature, notarisation, validity period, amount and expiry warnings.
  • A status on each row: Missing, In progress, Ready or N/A, plus, where it finds one, a link to the vault item that satisfies it.

How it works

The Submission Guard is the last step of the bid wizard, Guard & export, and a tab of its own in every bid's workspace. In order:

  1. 1Upload and analyse the tender pack. The analysis supplies the mandatory documents, bid security, validity, deadline and submission rules the checklist is built from.
  2. 2Put your evidence in the Company Vault. Certificates, licences, insurances, financial statements and CVs live there, each with its expiry date where it has one. On the Configure step, Bidligence lists what the tender needs that only you can supply, such as certificates, financials, bonds and signed forms, so you can upload them before the run.
  3. 3Generate the package. The run prices the BOQ first if the bid has none yet, writes the documents you ticked, then builds the Submission Guard checklist whatever you ticked. The Bid Preparation Report closes it.
  4. 4Read the checklist. Each row shows the vault item or generated document it is linked to. The readiness score and the pre-submission audit sit above the rows, the countdown to the deadline beside them.
  5. 5Close the gaps. Link or upload evidence from the row, change a status, write a note, or add a row the tender needs that the checklist missed. Rebuild draws the checklist again from the current analysis and package.
  6. 6Export and submit. The Submission Checklist exports as an editable DOCX or XLSX, and travels in the package ZIP as a DOCX with the vault files linked on it. Signing, sealing and delivery are your team's.

What you see on the Guard & export step

The checklist, its audit and the countdown share one screen:

  • A readiness score: the share of mandatory rows marked Ready, as a percentage and as "x of y mandatory items ready". Rows marked N/A are left out of the count.
  • A pre-submission audit in plain sentences: the number of mandatory items still missing; the bid security the tender requires, with its type, amount and validity where the analysis found them, and a reminder to check amount, wording and validity against the instructions to bidders; linked evidence that has expired; unverified claims flagged in the generated documents, to confirm or remove; a missing priced BOQ; and a deadline two days away or less, with a reminder to allow for courier or portal upload time.
  • A clean result that still asks for a person. When none of those lines applies, the audit reads clean and asks for a final human read-through of every form. Rows still In progress, such as forms waiting for a signature, do not stop it reading clean, so check them and the readiness score too. While the expiry of linked evidence is still being checked, it says so instead of reading clean.
  • A countdown to the closing date and time in the tender's own time zone, with the submission method and address.
  • The evidence on each row: the linked vault item with its expiry date, in red once it has expired and in amber within 60 days of expiry. A searchable picker over the whole Evidence Vault lets you change or remove the link, and linking an item marks the row Ready.
  • Upload from the row. On a row with no link, pick a file from your computer: it goes into your Company Vault, links to the row and marks it Ready. This shortcut does not run the vault's extraction, so it spends no credits, but it also records no expiry date and the file is not read into your bids; set both in the vault.
  • Your own rows. Add a requirement the checklist missed, such as a notarised joint venture agreement, with its category. It gets an M- reference, such as M-14, and is kept every time the checklist is rebuilt.

Documents from the package are linked by fixed rules

Super Intelligence drafts the checklist, but whether a document Bidligence generated satisfies a row is decided by fixed rules in the code, not by the model. A form drafted for signature is not a signed one, so a row answered by the Forms & Declarations pack or by the cover letter, such as a letter of bid or form of tender, is never marked Ready on the strength of the draft: it reads In progress unless your own vault evidence was linked to it. Wording that demands an executed instrument, such as a notarised or apostilled original, wet-ink signatures, a bank guarantee, a surety or a sealed envelope, keeps a row from reading Ready on a generated document alone. The model's own Ready is checked too: it stands only when the vault item it linked is in your workspace's vault and has not expired. Otherwise the row reads Missing, or In progress when a document drafted in this package answers it, and a link to an expired item stays on the row so you can see its date.

The design drawings row follows the bid's current drawing set: a newer set that has not been signed off takes it back to In progress, unless you set its status yourself. The Bid Preparation Report is written after the checklist, from its current state, and is instructed to list every row that is neither Ready nor N/A among its outstanding actions, so "sign the declaration of eligibility" or "notarise the power of attorney" stays on someone's list.

The row asks forWhat it links toThe status it gets
A bill of quantities, price schedule or financial proposalThe priced BOQ, once the bid has oneReady, unless the wording demands an executed instrument, or the row also asks for the letter of bid or a declaration, which still needs your signature (In progress)
A method statement, programme, risk register or other written documentThe generated document from this package. A row that needs several, such as a full technical proposal, links only when all of them existReady, with the same exception
A cover letter, letter of bid or form of tenderThe generated Cover Letter & Bid Form, once generatedIn progress, with a note to sign, stamp or attach the required original, until you link your signed copy or mark it Ready
A declaration of eligibility or conformity, code of conduct, conflict-of-interest, integrity or anti-corruption formThe Forms & Declarations pack, once generatedIn progress, with a note to sign, stamp or attach the required original
A certificate, financial statement or bondEvidence from your vault; no document drafted for this bid satisfies it, the priced BOQ includedReady once you link your own evidence
Design drawingsThe bid's current drawing set, if there was one when the checklist was builtIn progress until a registered engineer's sign-off is recorded on that set

When an addendum changes the rules

Upload an addendum or clarification to the bid and run the addendum review. Bidligence compares it with the existing analysis and lists each change with what it was, what it is now, a severity of critical, major or minor, and what your team must do about it. Then it:

  • adds the documents it reads as new to the checklist as Missing rows, with a note naming the addendum, and skips any already there by reference or by the opening words of the requirement;
  • moves the bid deadline when the closing date changed, but only to a date that has not passed. If the new date cannot be read, has already passed, or would pull the deadline earlier without a recorded deadline change, the deadline is left alone and you are told to set it by hand;
  • flags the generated documents that need updating, with the reason;
  • files the bidder questions the addendum answers as clarifications on the bid;
  • notifies the bid's team.

The most recent addendum review can be undone. If the analysis has been edited since, Bidligence refuses the undo rather than throw those edits away, and asks you to make the changes by hand or keep the review. Rows an addendum review added are kept when the checklist is rebuilt.

Work out your bid validity and bid security dates

The audit names the bid security the tender asks for, with its type, amount and validity where the tender states them. Getting the bank's guarantee issued with the right dates is your job, so check them before you request it. Take the deadline, the bid validity period and, where the tender requires the security to outlast the bid, the extra days from the bid data sheet and the latest addendum.

The calculator counts calendar days from the deadline date; if the tender counts differently, or the employer extends the validity period, its wording wins. It runs in your browser and nothing you type leaves this page. Bid security and bid validity explains how the two periods fit together.

Bid validity and bid security dates

Uses the tender’s own figures: take them from the Bid Data Sheet and the latest addendum. Nothing you type leaves this page.

Choose the deadline date and enter the validity days from the tender.

Counted in calendar days from the deadline date. If the tender counts differently, or the employer extends the validity period, its wording wins.

How it connects to the rest of the bid desk

The Submission Guard draws on other parts of the bid desk and reports back into several of them:

  • The Company Vault holds the certificates, licences, insurances and financial statements, with their expiry dates, that the rows link to.
  • Evidence-locked AI flags claims in the generated documents that it could not tie to your evidence; the audit counts them and asks you to confirm or remove each one.
  • The priced BOQ satisfies the tender's pricing schedule rows, and the audit says so when there is none.
  • The Mock Evaluator scores the package criterion by criterion and lists pass/fail issues separately from its score, so content gaps show up beside the paperwork gaps.
  • Design drawings link as drafted until a registered engineer signs the set off.
  • Deadline tracking: reminder e-mails, sent 7, 3 and 1 days before the deadline (each team member can keep any of those days and drop the rest), say how many mandatory checklist items are still missing, and the dashboard's list of upcoming bids flags the same count.
  • Bid exports carry the Submission Checklist as DOCX or XLSX, and the package ZIP adds the vault files linked on it in a company documents folder.
  • Hunter, the bid agent, can hand the package run to the panel beside its chat, and that run builds the checklist with the documents.

Its limits, and your control

The Submission Guard checks the package against what it can read. Know where that stops:

  • It is a check, not a promise of compliance. A clean audit means it found nothing to report, and rows still In progress do not stop it reading clean. Whether the bid is responsive is decided by the procuring entity.
  • It only knows what you uploaded. A requirement in a document you did not upload, or in an addendum you have not reviewed, is not on the checklist. Add it as your own row.
  • The rows are drafted by Super Intelligence. It reads the tender's requirements and proposes rows and vault links; check them against the instructions to bidders and the bid data sheet. Links to generated documents follow the fixed rules above.
  • Signing, originals and delivery stay with you. Signatures, stamps, page initials, notarised documents, the bank's guarantee and the portal upload or hand delivery are your team's to do.
  • A rebuild redraws Bidligence's own rows. Rows you added and rows from an addendum review are kept; the rows built from the tender are drawn again, so re-check any status you changed by hand on them.
  • Changes need the Finance role or higher. Finance, Technical lead, Bid manager and Admin members can rebuild the checklist, change statuses, links and notes, and add or remove rows; Viewers and Reviewers cannot.
  • It uses credits. Building or rebuilding the checklist and running an addendum review draw on the workspace's credits; linking evidence, uploading from a row and editing rows do not.

Which plans include it

The Submission Guard checklist is part of Starter (US$399 a month) and Pro (US$799 a month), each starting with a 3-day free trial, and of Enterprise. It is built by every document generation run, and generating the bid documents needs one of those plans. A free workspace gets 500 welcome credits once its e-mail is confirmed: enough to analyse a tender, which reads its mandatory documents, bid security, validity and deadline, get its Bid Score and see its BOQ priced. See pricing.

Questions

What does the Submission Guard check?
Every mandatory form, certificate, bond, format and submission rule read from the tender, matched against your Company Vault and the documents Bidligence generated for the bid. Its audit lists missing mandatory items, the bid security the tender requires, expired linked evidence, unverified claims in the generated documents, a missing priced BOQ and a deadline two days away or less.
Does a clean audit mean my bid is compliant?
No. It means none of the audit's lines applies: no mandatory item is Missing, the tender asks for no bid security, no linked evidence has expired, no unverified claim is flagged, the BOQ is priced and the deadline is more than two days away. Rows still In progress, such as forms waiting for a signature, do not stop it reading clean. It is a check, not a guarantee: the evaluation is the procuring entity's, and signatures, originals, the bid security and delivery remain your team's job. Even a clean audit asks for a final human read-through of every form.
Will it catch an expired certificate?
Yes, for evidence linked from your Company Vault with its expiry date recorded. Super Intelligence is told to propose only unexpired vault items as links, and a row it links to an expired item is not marked Ready; a linked item that has expired shows its date in red and is counted in the audit, and one within 60 days of expiry shows in amber. The vault and the dashboard flag expiring items too.
Why is a form Bidligence drafted still marked In progress?
Because a drafted form is not a signed one. Rows answered by the Forms & Declarations pack or by the cover letter, such as a letter of bid, read In progress with a note to sign, stamp or attach the required original, unless your own vault evidence was linked to them, and any row whose wording demands a notarised original, a bank guarantee or a sealed envelope never reads Ready on a generated document alone. Mark it Ready yourself once it is done.
What happens when an addendum adds a new requirement?
Upload it and run the addendum review. Documents it reads as new are added to the checklist as Missing rows naming the addendum, the deadline moves if the closing date changed to a future date, and the generated documents that need updating are flagged with the reason.
Which plans include the Submission Guard?
Starter, Pro and Enterprise. The checklist comes with every document generation run, which needs one of those plans; Starter and Pro each start with a 3-day free trial. A free workspace's 500 welcome credits, granted once your e-mail is confirmed, cover analysing a tender, which reads the requirements the checklist is built from, its Bid Score and a priced BOQ.

Sources

Rules and portals change. Check the tender’s own documents and the official source before you rely on any of this.

Check your next bid before you seal it

Sign in and open the Guard & export step of your next bid to see what is missing, expired or still to be signed. New to Bidligence? Create a free workspace: once your e-mail is confirmed, its 500 welcome credits cover a tender's analysis, and Starter and Pro each start with a 3-day free trial.

Cookies on Bidligence